Faizabad
EV Charging Stations in Faizabad, Uttar Pradesh
9 charging stations in Faizabad. Find AC and DC fast chargers with locations and connector types.
Faizabad has 9 EV charging stations in Uttar Pradesh across 3 charging networks, 9 of them with DC fast charging. Supported connectors include CCS2 and IEC 62196 Type 3A. Browse the stations below, or pick a network to narrow by operator.
EV Charging Stations in Faizabad by Network
9 Electric Car Charging Stations in Faizabad
Statiq Hub Charging Station in Statiq Lakshman Kunj Ayodhya Station, Basement Parking
Civil Line, Basement Parking, Faizabad 224001
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 60 kW | ₹22.99/kWh |
| IEC 62196 Type 3A | 3.3 kW | ₹15.99/kWh |
- Station Timings:
- Open 24 hours
Tata Power Charging Station in Guptar Ghat (ADA Parking), Darshan Nagar
Ashapur Village, Darshan Nagar, Faizabad, Deokaali, Uttar Pradesh 224123
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 30 kW | ₹21/kWh |
- Station Timings:
- Open 24 hours
Tata Power Charging Station in Parking Surya Kund (ADA Parking), Darshan Nagar
Ashapur Village, Darshan Nagar, Faizabad, Deokaali, Uttar Pradesh 224123
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 60 kW | ₹21/kWh |
- Station Timings:
- Open 24 hours
Tata Power Charging Station in Shane Avadh Hotel, Civil Lines
A- Hotel Shane Avadh, Civil Lines, Faizabad, Uttar Pradesh 224001
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 30 kW | ₹21/kWh |
- Station Timings:
- Open 24 hours
Tata Power Charging Station in Prayag Udyog NH 27 Charging Station, Ayodhya
Govt Polytechnic, Lucknow Road, Banbeerpur, Ayodhya, FAIZABAD, Uttar Pradesh 224001
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 25 kW | ₹21/kWh |
- Station Timings:
- Open 24 hours
BPCL Charging Station in MANGALAM FILLING STATION, SARAI BAJU NH 330 SORAON
SARAI BAJU NH 330 SORAON, Faizabad, Uttar Pradesh 212502, India
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 60 kW | ₹14/kWh |
- Station Timings:
- Open 24 hours
Tata Power Charging Station in Collectorate Office MLCP Parking Ayodhya Charging Station
New Colony, Ayodhya, Uttar Pradesh, FAIZABAD 224123
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 60 kW | ₹21/kWh |
- Station Timings:
- Open 24 hours
BPCL Charging Station in 24X7 FUEL POINT
FAIZABAD, Uttar Pradesh 224001, India
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 30 kW | ₹14/kWh |
- Station Timings:
- Open 24 hours
BPCL Charging Station in DR. S.D YADAV FILLING STATION
FAIZABAD, Uttar Pradesh 224001, India
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 30 kW | ₹14/kWh |
- Station Timings:
- Open 24 hours
DC Fast Charging in Faizabad
Faizabad has 9 DC fast charging stations in Uttar Pradesh. DC fast chargers deliver 30–150 kW and can charge most EVs to 80% in under 45 minutes. AC chargers (Type 2) are slower but widely available for overnight or workplace charging.
EV Charging Stations in Other Uttar Pradesh Cities
FAQs
How many EV charging stations are in Faizabad?
There are 9 EV charging stations in Faizabad, Uttar Pradesh, based on aggregated data from multiple charging networks.
What types of chargers are available in Faizabad?
Faizabad has 2 connector types: CCS2, IEC 62196 Type 3A.
Are there DC fast charging stations in Faizabad?
Yes, Faizabad has 9 DC fast charging stations in Uttar Pradesh. DC fast chargers typically deliver 30–150 kW, charging most EVs to 80% in 20–45 minutes.
How do I start a charging session at a public EV charging station?
Most public charging networks in India use a dedicated mobile app or an RFID card. Typically you download the network's app, add a payment method, plug the connector into your vehicle, and start the session from the app or by scanning a QR code on the charger.