Bajidpur
EV Charging Stations in Bajidpur
1 charging station in Bajidpur. Find AC and DC fast chargers with locations and connector types.
Bajidpur has 1 EV charging station across 1 charging network, with DC fast charging. Supported connectors include Type 2 and CCS2. Browse the stations below, or pick a network to narrow by operator.
EV Charging Stations in Bajidpur by Network
1 Electric Car Charging Station in Bajidpur
Yohub Charging Station in Reliable Charge Hub Sector 135, Wazidpur, Sector 130, Noida, Bajidpur, Uttar Pradesh 201304, Baji
Sector 135, Wazidpur, Sector 130, Noida, Baji, Bajidpur 201304
| Connector | Power | Price |
|---|---|---|
| CCS2 · DC | 120 kW | ₹18/kWh |
| CCS2 · DC | 60 kW | ₹18/kWh |
| Type 2 · AC | 7 kW | ₹18/kWh |
| Type 2 · AC | 3 kW | ₹18/kWh |
- Station Timings:
- Open 24 hours
EV Charging Stations in More Cities
FAQs
How many EV charging stations are in Bajidpur?
There is 1 EV charging station in Bajidpur, based on aggregated data from multiple charging networks.
What types of chargers are available in Bajidpur?
Bajidpur has 2 connector types: CCS2, Type 2.
How do I start a charging session at a public EV charging station?
Most public charging networks in India use a dedicated mobile app or an RFID card. Typically you download the network's app, add a payment method, plug the connector into your vehicle, and start the session from the app or by scanning a QR code on the charger.